parking space(0.8--1mmthick):
name of the paint |
paintingarea/kg |
used amount/㎡ |
环氧封闭底漆
epoxy sealing primer |
7㎡/kg |
0.14 kg/㎡ |
epoxy floor intermediate coat |
0.83㎡/kg
(with sand) |
1.2
kg/㎡ |
0.36 kg/㎡ |
200 quartz sand |
0.84 kg/㎡ |
epoxy floor topcoat |
3.5㎡/kg(twice) |
0.3 kg/㎡ |
main lane(1.5mm thick):
name of the paint |
paintingarea/kg |
used amount/㎡ |
epoxy sealing primer |
7㎡/kg |
0.14 kg/㎡ |
epoxy floor intermediate coat |
0.4㎡/kg
(with sand) |
2.5
kg/㎡ |
0.75 kg/㎡ |
quartz sand |
1.75 kg/㎡ |
epoxy floor topcoat |
3.5㎡/kg(twice) |
0.3 kg/㎡ |
note: paint 2 layers of intermediate coat mortar. paint the first layer with 40 mesh quartz sand. paint the second layer with 200 mesh quartz sand.
3. ramp(2.5-3mm thick):
name of the paint |
paintingarea/kg |
used amount/㎡ |
epoxy sealing primer |
7㎡/kg |
0.14 kg/㎡ |
epoxy floor antiskid mortar |
0.28㎡/kg
(with sand) |
3.5
kg/㎡ |
1.7 kg/㎡ |
quartz sand |
1.8 kg/㎡ |
epoxy floor paint |
5㎡/kg(once) |
0.2 kg/㎡ |
note: paint two layers of antiskid mortar with 40 mesh quartz sand
construction reference:
1. environment and substrate treatment: the temperature is above 5℃. the relative humidity is less than 75%. the new cement floor can be painted after being dried for 28 days. remove the dirt and repair the old and loose place. wear the surface with electric buffing machine. remove the dust. ensure that no dust, no water, no grease.
2. paint the sealing primer: mix the two compents of the sealing primer according to the proportion and stir it. after laying the paint for 10 minutes roller coat the paint.(use it up within 6 hours or it will become blue). after 12 hours paint next layer.
3. paint intermediate coat paint: wear it after at least 12 hours when the epoxy primer is dry. mix the two compents according to the proportion and stir it. after 10 minutes mix the paint and quartz sand according to the proportion of 3︰7 and stir it .the paint can be used.( use it up within 6hours or it will become blue), wear and clean the surface after a day of drying.
4. paint the topcoat: mix the two compents of the sealing primer according to the proportion and stir it. after laying the paint for 10 minutes roller coat the paint.(use it up within 6 hours or it will become blue). after 1 day? paint next layer. viscosity depends on the construction plan and use matching diluent. after 24 hours of drying maitain it for 7 days. then it can be used.