epoxy self-凯发k8网址手机下载

")); epoxy self-凯发k8网址手机下载
 
 anticorrosion paint
 floor paint
 epoxy zinc-rich primer
 alkyd paint
 alkyd mixed paint
 steel bridge paint
 antirust paint
 epoxy asphalt paint
 anticorrosion of the sewage reservoir
 asphalt paint
 heat-resistance paint
 power plant steel structure
 aluminum alloy
 concrete anticorrosion
 galvanized steel paint
 epoxy thin film floor paint
 epoxy paint
 epoxy self-leveling thin film floor paint
 epoxy self-leveling thick film paint
 antistatic paint
 epoxy mortar thick paste antistatic floor paint
 polyurethane thin film floor paint
 polyurethane mortar thick film floor paint
 polyurethane paint
 parking lot floor construction
 water-based epoxy floor paint
 organic silicone heat resistance paint
 
your location: home > project > epoxy self-leveling thin film floor paint

epoxy self-leveling thin film floor paint

环氧自流平薄涂地坪

this is the modified amine-curing solvent-free two-component epoxy floor paint. it enjoys excellent luster, fullness, water resistance, chemical resistance, impact resistance and wear resistance. it’s suitable for thick film construction.
thin film: (thickness of 1mm)


name of the paint

paintingarea/kg

used amount/㎡

thickness(about)

epoxy sealing primer

7㎡/kg

0.14 kg/㎡

15um

epoxy self-leveling floor topcoat

1.25㎡/kg

0.9 kg/㎡

900um

construction reference:

1. surface treatment: the water content of the cement is below 8%. the strength is qualified. remove the dirt and loose part. wear the surface with buffing machine. the surface parameter is within 1mm. remove the extra part with angle grinder or fill it with mortar. fill all the cracks and concave hole. the surface must be firm, dry and no dust.

2. roller coat the sealing primer: after the preparation work roller coat the sealing primer. brush the paint uniformly without any leaks. after 12 hours of drying do the next work.
3. self-leveling topcoat(about 1mm thick): check the mortar whether it is dry. if it is qualified paint the topcoat with a trowel one time. mix the two components uniformly. deaerate and brush after 5 minutes of aging. use the paint up within 2 hours. deaerate the surface with needle roller. check the film with cleats on it. after it is qualified seal the site and avoid dust. maintain the site for 72 hours. then it can be used.

 

 

 

 
office telephone:022-86872099 26910927   fax:022-26910931   24 hours service hot line:13821032998
address:qudian industrial area, beichen district,tianjin      technology:tianjin chenguang chemical coating co,. ltd.
products links:paintcoatinganti-rust paint heat resistancefloor paintepoxy zinc-rich primer and carbon paintanti-corrosion paintasphaltum paintanti-staticpaint