丙烯酸建筑工程漆
introduction: the paint enjoys good covering power. it improves the plastering on the concrete. the quality of the construction is enhanced. the construction progress is faster. the materials are saved.
application:
painting area: 6 – 7 m2/ kg one time
way of painting: brush painting, spraying, roller coating
diluting: use 5% water to dilute the paint
recommended matching: 20%
surface treatment: remove the loose part, dirt and other impurity on the surface. ensure that the surface is clean. paint anti-mildew agent first to prevent the mold.
construction condition: above 5℃
repainting time: the interval is at least 2 hours. the drying time surface is 4 hours. the hard drying time is 24 hours. (30℃)
storage temperature: between 0℃-35℃ the shelf life is 6 months. if the paint is sprayed to the eyes wash the eyes with water immediately.
|